asfalto a freddo

COLD ASPHALT

Using 100% of milled asphalt
Why regenerate?
  • To recuperate old bituminous road surfaces
  • To reduce the thickness of layers to place
  • To repair deformed layers
  • To regenerate white roads
  • To reduce the exploitation of new quarries
  • To eliminate the transportation costs to and from the construction site
  • To reduce operating times of worksites
  • To reduce the number of vehicles in circulation to and from the work site
Why cold recycling?
  • Energy saving
  • To reduce dust and noxious fumes
  • For a better environment
  • To be sustainable

LABORATORY RESULTS

The tendency of the (Rt & CTI) performance is to improve over time. This allows this technology to compete in strength with hot asphalt.
Indirect traction coefficient of CTI (N / mm2)
Indirect traction Rt (N / mm2)